| Title: | Sensitivity analysis and pre-feasibility of reprocessing Au from a tailings dam in the Iron Quadrangle - The case of Cocoruto Dam, Nova Lima, Minas Gerais |
| Authors: | Lemos, M. Valente, T. Marinho Reis, P. Fonseca, R. |
| Keywords: | circular economy mining tailings Au recovery Benefit Function feasibility |
| Issue Date: | 2024 |
| Citation: | LEMOS, M.; VALENTE, T.; MARINHO REIS, P.; FONSECA, R. (2024) Sensitivity analysis and pre-feasibility of reprocessing Au from a tailings dam in the Iron Quadrangle - The case of Cocoruto Dam, Nova Lima, Minas Gerais" Mining • REM, Int. Eng. J. 77 (3) • 2024 • |
| Abstract: | As historical waste has accumulated in dams, the interest in studying the feasibility
of reusing mining tailings has grown, offering both environmental and economic
advantages. However, given the unique characteristics of each site, conducting
site-specific assessments is crucial. Building on a detailed evaluation of the Cocoruto
Dam in Nova Lima, Minas Gerais, this study presents a technical feasibility and financial
viability analysis of three potential reprocessing scenarios. The primary objective
was to assess the viability and potential benefits of reusing Au tailings. The
proposed methods involve grinding, calcination and leaching, with designs adaptable
for existing metallurgical plants. Considering the economic potential of Au in these
inactive mine tailings (with an average grade of 0.95 mg/kg and a total resource of
3,350.55 tonnes), multiple factors were analyzed to determine the feasibility of Au
production from this source. Analyzed variables included: cut-off grades and tonnage
for each scenario; net present value (NPV) calculated with an 8% annual discount
rate; a general slope angle of 20 degrees; three possible final pit configurations; different
annual production rates (400,000 t, 800,000 t and 1,000,000 t), and various Au
ounce values ($1300/oz, $1500/oz, and $1700/oz). From a financial perspective, for
all ounce values and an annual production of 400 tonnes, all scenarios prove profitable.
However, other risks and parameters should be further evaluated. |
| URI: | https://doi.org/10.1590/0370-44672023770083 http://hdl.handle.net/10174/40820 |
| Type: | article |
| Appears in Collections: | ICT - Publicações - Artigos em Revistas Internacionais Com Arbitragem Científica
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|